The BBC Cellpack electrical component is a two-chamber material with a content of 2,000 mL. The processing time for preparing 300 mL varies depending on the temperature: 40 minutes at 5 °C, 23 minutes at 23 °C, and 15 minutes at 35 °C.
- Content: 2,000 mL
- Packaging: 2 chambers
- Shelf life: 40 months at an ambient temperature of 15–35 °C
- Processing time for 300 mL at 5 °C: 40 minutes
- Processing time for 300 mL at 23 °C: 23 minutes
- Processing time for 300 mL at 35 °C: 15 minutes
- Density: 1.1 g/cm³
- Hardness: 55 Shore D
- Total mass after curing: 4%
- Impact strength: > 10 kJ/m²
- Operating temperature range: -40–105 °C
- Exposure temperature: ≤ 80 °C
- Ignition temperature of base component: ≥ 200 °C
- Ignition temperature of bonding component: ≥ 200 °C
- Flammability: Class 2C
- Voltage test: > 20 kV for 1 minute at 80 °C
- Resistance to tracking: KA 3c
- Dielectric constant at 23 °C and 1 kHz: 5.3
- Dielectric constant at 23 °C and 50 Hz: 5.1
- Insulation material dissipation factor at 23 °C and 50 Hz: 0.08
- Electrolytic corrosion: A 1
- Hydrolysis resistance: After immersion in water for 28 days at 90 °C
- Elongation at break: 60%